
Risk Prioritization in Power Plant By Using FMEA & AHP Method - Paperback
Risk Prioritization in Power Plant By Using FMEA & AHP Method - Paperback
$62.84
/

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
by Nilmani Sahu (Author), Sanjay Kumar Singh (Author), Dinesh J. P. Dubey (Author)
The analysis of failures of various equipment in an industry plays a crucial role in order to avoid the breakdown. In this content, Failure Modes & Effect Analysis and Analytic Hierarchy Process approach is used for prioritizing the risk of failure in turbine auxiliaries of Power Plant.The outcome from the FMEA & AHP analysis are compared and found that turbine bearing temperature in the Turbine auxillary is very severe in risk. The results are almost same for both the analysis of AHP & FMEA. Also after focusing on the problems identified in the plant by the professionals, maintenance & replacements of the machinery has been proposed, which will result in improvement in efficiency of the plant. This research serves as a failure prevention guide for those who work on the Power Plant operation.



















